The Opportunity
Self-Improving Technology
- The first technology that helps build itself: it writes code, generates training data, and designs chips. Humans still steer.
Intelligence Scales With Compute
- Capability rises predictably with data, model size, and compute, both in training and at the time of use.
- Each step up costs a multiple of the compute, so it takes more chips, memory, and power.
Usable Without Skills or Special Language
- Plain-language instructions, nothing to learn. Adopted faster than the PC or the internet.
The Cost of Intelligence Is Falling
- The price of a given capability falls steeply each year. Usage has grown faster than prices fell.
From Answers to Actions
- Agents do the work. Pricing is moving from per seat to per task. Robots and driverless taxis use the same methods.
Comparisons to Prior Innovations
- Like electricity: a metered input applied to any problem, with gains arriving once work is redesigned around it.
- Like the railroad: it makes new work possible.
- Not the telecom overbuild: capacity is pre-contracted, the buyers are highly profitable, every query burns compute, and old chips keep renting.
Where the Gains Land
- Sized against labor, not IT budgets. Small gains on large bases are worth a great deal.
- Services, science and medicine, and the buildout itself. Earnings show up where workflows are redesigned.
A Race Like the Nuclear Race
- A national-security race, with China months behind. Military uses are already proven.
Governments Are Participants
- Subsidies, equity stakes, mineral price floors, full expensing, and faster nuclear licensing. National compute campuses abroad.
The Bottlenecks
Chips and Equipment
- One to three suppliers: TSMC, three HBM makers, ASML. Memory is now a binding constraint.
Materials
- Copper is outrunning new mine supply. China controls rare earths.
Power
- Demand is growing again. Grid connections and transformers take years.
Behind the Meter
- Campuses build their own gas, fuel cell, and solar plus battery power, and trade the grid queue for permits and electricians.
Capital
- Funded from cash flow, but more and more from debt and off-balance-sheet deals.
The Stack
Power
Behind the Meter
- The fastest route to power, and it stays on as backup afterward.
Grid
- Transformers, switchgear, transmission, all with long lead times.
Nuclear
- Long-term baseload. Contracts and restarts now; SMRs paced by licensing and fuel.
Solar
- Cheapest new capacity. Most important at home, to get households off grid dependence.
800-Volt DC
- Denser racks force new power gear.
Chips
GPU
- NVIDIA sells whole systems on an annual cadence.
Memory
- Limits serving speed. Cyclical, but shortages last years.
Foundry
- TSMC leads. Arizona gets the newest nodes after Taiwan.
Semiconductor Equipment
- ASML alone makes EUV. New designs need more tools per wafer.
Custom ASICs
- Hyperscaler chips, built with Broadcom and Marvell.
Inference Silicon
- Cost per token and tokens per watt decide purchases.
Power Semiconductors
- SiC and GaN for high-voltage efficiency.
EDA and IP
- Every chip starts here. Synopsys and Cadence lead.
CPU
- Hosts accelerators and runs agent tool calls.
Analog
- Sensors and motor drivers for robots and vehicles.
Edge
- On-device models shift compute cost to the device buyer.
Infrastructure
Data Centers
- Sites with power and permits are scarce. Dense racks need liquid cooling.
Optical
- Optics carry everything past a few meters.
Networking
- Links thousands of accelerators into one system.
Hyperscalers
- Their capex sets demand for the whole stack.
Neoclouds
- GPU rental with concentrated customers and GPU-backed debt.
Quantum
- Pre-commercial. An option.
Models
Closed
- Compute commitments exceed revenue, and partly supplier-financed.
Open
- Trails the frontier by months. Sovereign and enterprise control.
Applications
Software
- Agents on systems of record, priced per task.
Cyber
- More attack surface, and better defense.
Robotics
- Early use in warehouses and factories.
Devices
- Models run on phones and PCs.
Drones
- Have changed warfare. Autonomy bought at scale.
Space
- LEO broadband and direct-to-device.
Streaming
- Cheaper production and localization.
The Narratives
Safety and Loss of Control
- Misuse is real, but some warnings serve regulatory capture. Humans still steer.
Jobs
- Less entry-level hiring in exposed jobs, overall employment holding, and the buildout is hiring trades.
The Bubble
- Circular financing and customer concentration are real, but buyers are profitable and old GPUs still rent.
Efficiency
- Cheaper compute has raised total spending so far.
Electricity Prices
- Many drivers. Large-load tariffs make data centers pay their way.
Climate
- Tech is a top buyer of clean power, though on-site gas adds local emissions.
Water
- Depends on cooling and location. Small next to agriculture, but local.
Concentration of Power
- Low at the model layer, high in the physical supply chain.
Misinformation
- Fakes are cheap and fraud is rising. Detection is improving.
The Capability Wall
- Solves competition math and code, but still fails on novel and long tasks and still hallucinates.
Bull Narratives
- Labs, cheap memory, and "anything with a plug" each fail: prices fall, cycles turn, and permits bind.
The Risks
Policy
- Medium likelihood, high impact. State-law patchwork, slow permits, shifting tariffs.
Sentiment
- Medium and rising, high impact for campuses. Moratoriums are spreading.
Credit
- Digestion medium; one-counterparty stress less likely but high impact; efficiency outrunning demand unlikely but very high impact. Neoclouds and closed labs most exposed.
Firm Supply
- High likelihood, low impact. A tailwind for turbine, grid, and BTM suppliers.
Interconnection
- High likelihood, low impact unless a campus is unconnected.
Supply Chain
- High likelihood, low impact. Trades and single-source chips.
China
Taiwan
- Very low likelihood, very high impact.
Rare Earths
- Medium likelihood, low impact. Robotics and drones exposed.
Intellectual Property Theft
- High likelihood, medium impact. Model distillation.
Export Controls and Smuggling
- Swings likely. Hits chip revenue, not the buildout.
Military
- Tracks the frontier gap. Total impact.
Europe
- Very likely, very low impact.
The Signals
Demand and Cash
- Lab revenue must turn into cash. Watch for divergence across operators, not one miss.
Capital and Credit
- Spreads, private credit, depreciation lives, GPU rents, rates.
Supply Discipline
- Capacity added against orders extends the cycle; speculation ends it.
Power and Grid
- Interconnection, BTM permits, large-load tariffs, capacity auctions.
Policy and Sentiment
- Permits and moratoriums move before prices.
China
- The frontier gap, Taiwan, rare earths, smuggling.
Adoption and Productivity
- Agents in systems of record, quantified results, productivity, entry-level hiring.
Viewpoints
The Super Intelligence Renaissance
Last Updated: 11 October 2026
The Opportunity
Super Intelligence ("SI"), formerly called artificial intelligence ("AI"), helps improve itself, gains capability predictably as compute increases, and takes instructions in ordinary language from anyone. The United States government now uses the term SI in place of AI. Chips, memory, data centers, power plants, and grid equipment set the pace of the buildout, and atoms, energy, and capital constrain it more than demand does. The thesis holds that this is a multi-decade buildout rather than a single capital cycle. Suppliers of the scarcest inputs are paid first. Companies that rebuild their operations around SI, on assets and data competitors cannot buy, are paid longest. The risks that can slow the buildout are policy, local sentiment, credit, physical supply, and China, not the popular narratives. A short set of signals shows how turbulent the path is and when to size up or down.
Self-Improving Technology
Steam, electricity, and the microprocessor multiplied what people could produce, but none of them improved its own research and development ("R&D"). SI does. Models now write code, generate training data, and optimize software and chip designs at the companies that build them. Humans still direct the research, so this is an early stage of self-improvement, but measured capability on hard tasks keeps improving at a steady, rapid pace. The thesis treats that loop as the reason SI's progress should be underwritten as continuing rather than as a one-time step change.
Intelligence Scales With Compute
No standardized IQ test exists for models. Their capability is measured by prediction error and by exam and benchmark scores, and on those measures it rises predictably as compute increases. Larger models, more data, and more training compute improve capability along well-documented "scaling laws," and spending more compute on reasoning at the time of use ("test-time compute") improves it further. Frontier models now perform at expert level on many professional and academic exams.
Each equal step of improvement requires a multiple of the prior compute. That is the link between the technology and the physical economy: demand for more capable SI becomes demand for more chips, memory, data centers, and power.
Usable Without Skills or Special Language
Earlier software required users to learn its interface, from programming languages to application-specific commands. SI accepts instructions in ordinary language from technical and non-technical users alike. Generative SI has been adopted faster than the personal computer or the internet, and its potential user base is everyone who can describe a task.
The Cost of Intelligence Is Falling
The price of a given level of capability falls steeply every year. So far, lower prices have been followed by faster-growing usage and higher total spending, because each price drop makes new uses economic. Reasoning models and agents also use far more compute per task than chat did, so efficiency gains are absorbed by new demand rather than banked as savings.
From Answers to Actions
SI is moving from answering questions to performing work. Agents operate software, write and run code, and complete multi-step tasks, and some software vendors now price by work completed rather than by user seat. Robotics and autonomous vehicles apply the same methods to physical tasks, and driverless taxis already carry paying passengers. As SI performs work rather than assisting it, its market shifts from technology budgets toward labor.
Comparisons to Prior Innovations
Like the internet and prior digital innovations, SI can raise productivity in non-technology industries, such as physical logistics, or displace incumbents, such as software vendors, and it is being adopted faster than either.
Like electricity, SI is sold as a metered input, priced per token as electricity is priced per kilowatt-hour, and applied to whatever problem the buyer already has. Electricity's productivity gains came decades after the first power plants, once factories were redesigned around electric motors, and the manufacturers that redesigned captured the lasting advantage.
Like electricity and the railroad, SI makes possible work that was not possible before, not only easier work: protein structure prediction, drug and materials discovery, and computation beyond any team of people.
The SI buildout differs in four ways from the 1990s telecom overbuild, the comparison bears cite most often. Much new capacity is contracted with customers before it is built. The largest buyers are among the most profitable companies in the world. Usage consumes compute, since every query uses chips, memory, and power, whereas fiber capacity, once laid, multiplied cheaply. And older accelerators continue to be rented rather than left idle. Capital expenditure ("capex") can still overshoot in specific places, which the thesis tracks under Credit.
Where the Gains Land
Because SI performs work, its market is often sized against labor spending, which is far larger than technology spending. Measured productivity gains so far are largest for less-experienced workers and on tasks within the model's capability; on tasks outside it, quality can fall. Few companies yet report enterprise-wide earnings impact, and those that do have usually redesigned their workflows around SI. On large operating bases, small percentage improvements are worth large sums.
SI applies most directly to services built on documents, decisions, and coordination, such as healthcare, legal, education, and financial services; to science and medicine, including protein structure, drug discovery, and materials; and to manufacturing and construction, where the buildout of power plants, grid, fabs, and data centers is itself a construction cycle.
The thesis expects the order of returns to follow electrification: capacity first, then the redesign of work, then measured productivity. Suppliers of scarce inputs are paid first. Adopters that redesign around SI, on assets and data competitors cannot buy, are paid longest. Where every competitor gains the same capability, the gain passes to customers as lower prices.
A Race Like the Nuclear Race
Governments treat leadership in SI as a matter of national security, and the race is often compared to the nuclear race. Military uses are already demonstrated. SI-assisted targeting lets small teams do the work of much larger staffs. Low-cost drones have reshaped the battlefield in Ukraine, and militaries are buying autonomous systems in large numbers. SI has flown fighter jets in test dogfights against human pilots, and autonomous systems find and patch software vulnerabilities. China's military names "intelligentized warfare" as the coming form of war.
The United States aims to export its full SI technology stack to allies, so that the rest of the world builds on American rather than Chinese technology. Chinese models trail the United States frontier by months, not years, and United States labs have reported China-based groups distilling their models. With a gap that narrow, the thesis holds that a unilateral American slowdown would not slow China; it would change who leads.
Governments Are Participants
Governments fund, own, and buy parts of the buildout. The United States subsidizes domestic chip manufacturing, has taken equity stakes in strategic companies such as Intel and MP Materials, and has set price floors for critical minerals. Tax law lets companies deduct the full cost of qualifying equipment in the year it is bought. Federal policy aims to speed nuclear reactor licensing. Gulf states and other governments are building national compute campuses.
The Bottlenecks
The buildout is constrained by atoms, energy, and capital.
Chips and Equipment
Several critical inputs have one to three suppliers worldwide. TSMC makes most of the world's leading-edge chips, mostly in Taiwan. High bandwidth memory ("HBM") comes from three suppliers: SK hynix, Samsung, and Micron. HBM uses more wafer capacity per bit than standard dynamic random-access memory ("DRAM"), so HBM demand tightens the whole memory market; memory has become a binding constraint alongside power, and new memory fabs take years to build. ASML is the only maker of extreme ultraviolet ("EUV") lithography machines, which leading-edge chips require.
Materials
The hardware and the grid depend on materials with constrained supply. Copper demand from grids and data centers is rising faster than new mine supply, and new mines take many years to develop. China dominates rare earth refining and magnet production and has restricted exports, and building refining capacity outside China takes years.
Power
Compute needs power faster than the grid can supply it. United States electricity demand was roughly flat for over a decade and is growing again, led by data centers. Connecting new generation or large new loads to the grid takes years, and lead times and prices for large transformers and other grid equipment have risen. Capacity prices in PJM Interconnection ("PJM"), the largest United States grid region, have risen sharply with data center demand. Hyperscalers cite power and memory supply as their main constraints. What binds is less the physics of generating power than the time it takes to permit, equip, and connect it.
Behind the Meter
Data centers increasingly build their own generation behind the meter ("BTM") rather than wait for a grid connection. Natural gas is the most common BTM source, from reciprocating engines and turbines, followed by fuel cells; solar with batteries plays a smaller role. Large gas turbines are back-ordered for years, so smaller engines and turbines fill the gap. BTM trades the grid queue for air permits, gas pipeline capacity, and skilled labor, and electricians take years to train.
Capital
The buildout requires very large, multi-year capex. The largest buyers fund it mostly from operating cash flow, increasingly supplemented with debt, and a growing share is financed off balance sheet through joint ventures, private credit, and asset-backed debt, so the buildout depends on credit markets staying open.
The Stack
The stack follows NVIDIA's five-layer framing: energy, chips, infrastructure, models, and applications. It runs bottom-up because the binding constraints sit at the bottom.
The thesis applies four rules to the stack:
1. Own the inputs that stay scarce whichever model wins. 2. Own the workflows and distribution through which agents reach paying customers. 3. Hold the model layer as an option rather than a core position, given its capital needs and fast price erosion. 4. Prefer incumbents with hard problems and proprietary data over applications built on the same rented models as every competitor.
As models commoditize, pricing power moves down the stack to scarce physical inputs and up the stack to the owners of workflows and customers.
Power
Power is the binding constraint for many data center projects, so secured sites, permits, and long-lead equipment are the scarce assets in this layer.
Behind the Meter
On-site generation lets a campus run before, or without, a grid connection. Gas engines and turbines lead, followed by fuel cells, with solar and batteries in a smaller role. On-site units often stay on as backup or peaking capacity once the grid connection arrives, so BTM capacity keeps its value after the queue clears.
Grid
Transformers, switchgear, breakers, and transmission connect every power source to every campus, and all carry long lead times. Grid expansion is necessary and slow, which is why new capacity goes behind the meter first.
Nuclear
Nuclear is the largest source of carbon-free electricity in the United States. Technology companies are signing long-term contracts for nuclear power, including restarts of closed plants. Small modular reactors are moving through licensing and early construction, with licensing, first-of-a-kind cost, and fuel supply setting their pace, so they serve the longer-term baseload rather than the near-term gap.
Solar
Solar is the largest source of new United States generating capacity, and utility-scale solar is among the cheapest sources of new electricity. It is not firm power: around-the-clock supply requires storage or other generation, so at campus scale it complements gas and nuclear rather than replacing them. Home solar with batteries reduces a household's draw from the grid and relieves the same distribution network that campuses compete for.
800-Volt DC
Rising rack power is pushing data centers from low-voltage to 800-volt direct current ("DC") distribution, which reduces copper and conversion losses. The shift requires solid-state transformers, power supplies, busways, and protection gear.
Chips
Several chip inputs have one to three suppliers worldwide, and pricing power goes to whichever input is scarcest at a given point in the cycle.
GPU
NVIDIA's graphics processing units ("GPUs") hold most of the market for SI accelerators. NVIDIA sells full systems, including CUDA software, NVLink interconnect, and rack-scale designs, on an annual product cadence.
Memory
Memory bandwidth and capacity limit how fast large models can serve. Memory prices are cyclical, rising in shortages and falling as new capacity arrives, and because new fabs take years, shortages can last years.
Foundry
TSMC leads leading-edge chip manufacturing. It is adding capacity in Arizona, with the most advanced processes arriving there after Taiwan.
Semiconductor Equipment
ASML is the only supplier of EUV lithography. New transistor and memory designs add process steps and tools per wafer, raising equipment demand per chip.
Custom ASICs
Hyperscalers design their own application-specific integrated circuits ("ASICs"), such as Google's TPU, Amazon's Trainium, and Meta's MTIA, for their highest-volume workloads, working with design partners such as Broadcom and Marvell. The spend moves to design partners, packaging, and memory rather than disappearing.
Inference Silicon
As serving models ("inference") grows relative to training, cost per token and tokens per watt drive chip purchases.
Power Semiconductors
Silicon carbide ("SiC") and gallium nitride ("GaN") convert power more efficiently than silicon at high voltages and frequencies, and each gain in conversion efficiency frees power and cooling for compute.
EDA and IP
Every advanced chip is designed with electronic design automation ("EDA") software and licensed intellectual property ("IP") blocks. Synopsys and Cadence lead EDA, and more custom chips mean more design work.
CPU
Central processing units ("CPUs") host accelerators and run scheduling, data preparation, and the tool calls and code that agents execute, so agents add CPU demand.
Analog
Robots and vehicles require analog chips: sensors, data converters, motor drivers, and power management. Content per unit rises as SI moves into physical systems.
Edge
On-device inference runs models on phones and PCs, shifting part of the compute cost to the device buyer.
Infrastructure
Data centers, networks, and clouds turn chips into usable capacity.
Data Centers
Sites with secured power and permits are scarce, and state and local governments increasingly pause or restrict permits for large data centers. High-density racks require liquid cooling. Operators with secured power and diversified customers hold the durable position.
Optical
At the speeds large clusters run, copper reaches only a few meters, and optical links carry traffic beyond that.
Networking
Network fabrics connect thousands of accelerators so they train and serve as one system, and fabric quality sets how much of a cluster is usable.
Hyperscalers
Microsoft, Alphabet, Amazon, Meta, and Oracle are the largest buyers, and their capex plans set demand across the stack.
Neoclouds
Neoclouds rent GPU capacity, often to a few large customers, and finance it with debt backed by the GPUs. They carry the most leverage to the cycle and the most exposure to customer concentration.
Quantum
Quantum computing is pre-commercial for most workloads; its expected uses are simulation, materials, and cryptography. The thesis sizes it as a long-dated option.
Models
Prices for a given model capability fall quickly, and open-weight models trail the frontier by months. Returns at this layer depend on staying ahead rather than on any single model, which is why the thesis holds it as an option.
Closed
Frontier labs fund the largest training runs. Their compute commitments exceed their current revenue, and part of their financing comes from suppliers and cloud partners.
Open
Open weights let governments and enterprises run models on their own infrastructure, which pushes value toward the infrastructure and application layers.
Applications
In applications, returns go to whoever owns the workflow, the customer relationship, and the proprietary data.
Software
Agents attach to systems of record, where transactions happen, and some vendors price agents by task rather than by seat. Point solutions built on another company's system risk being bypassed by the system's owner.
Cyber
Agents add attack surface and also help defend it, which makes security a precondition for adoption rather than an adjacent market.
Robotics
Robotics foundation models apply SI to physical tasks, with early commercial use in warehouses and factories, where environments are controlled and tasks repeat.
Devices
Phones and PCs run models on the device, raising silicon and memory content per unit.
Drones
Low-cost drones have changed warfare, and militaries are buying autonomous systems at scale.
Space
Low Earth orbit ("LEO") satellites provide broadband and direct-to-device connectivity, which makes resilient communications a national security asset.
Streaming
Generative tools lower the cost of producing and localizing video and audio, which raises the relative value of owned catalogs and large audiences.
The Narratives
Each narrative below states the public claim, then the facts.
Safety and Loss of Control
The claim is that SI is not safe and that frontier labs see capabilities they cannot control without government help. Critics, including White House officials, argue that some labs use safety warnings to win regulation that favors incumbents. Misuse risks are real: SI can find software vulnerabilities, and safety guardrails can be bypassed. But current models still fail on long or unfamiliar tasks, and humans direct their development. Proposed checks include mutual pre-release testing among labs, including Chinese labs. The thesis treats security spending as a cost of adoption and licensing regimes as a policy risk.
Jobs
The claim is that SI will displace white-collar work at scale. Early evidence shows reduced hiring of young workers in the most SI-exposed occupations, while overall employment has so far held up. The buildout is increasing demand for electricians, construction crews, and technicians, and shortages in those trades are themselves a constraint on its pace.
The Bubble
The claim is that the buildout is a dot-com-style bubble sustained by circular financing. Circular financing exists: chip vendors invest in customers, clouds invest in labs that buy cloud capacity, neoclouds borrow against GPUs, and campuses are financed off balance sheet. A few customers account for much of the contracted demand, and hyperscalers have lengthened the depreciation lives of servers, which critics argue overstates earnings. Against that, older accelerators continue to rent, though rental prices fall as new generations ship, and the largest buyers are highly profitable. The thesis carries the legitimate part, concentration and depreciation, into Credit.
Efficiency
The claim is that cheaper training and inference will cut compute spending, as efficiency turned the telecom build into a glut. So far, falling prices have been followed by faster-growing usage and rising total spending, and reasoning models and agents use far more compute per task than chat. The claim becomes right only if rents on older accelerators fall below cost and stay there, which is why those rents are a confirming signal.
Electricity Prices
The claim is that data centers are raising household electricity bills. Retail prices reflect many factors: fuel and wholesale prices, distribution and transmission costs, storm and wildfire recovery, and capacity prices. Where data center demand drives up capacity prices, the cost reaches all customers unless tariffs assign it to data centers, and several states and utilities have adopted large-load tariffs that require data centers to pay for the capacity they reserve. The answer is tariff design and faster permitting.
Climate
The claim is that SI's power demand will reverse decarbonization. Data centers remain a minority of United States electricity demand, and technology companies are among the largest buyers of carbon-free power, including nuclear. Near-term on-site supply is mostly natural gas, which raises emissions where it is used; faster nuclear licensing is the lever that changes that.
Water
The claim is that data centers strain local water supplies. Water use depends on cooling design and location, and closed-loop and air cooling use little water. Much of a data center's water footprint is indirect, at the power plants that supply it. Nationally, data center water use is small next to agriculture; local impact depends on the watershed.
Concentration of Power
The claim is that SI hands economic and political power to a few firms. At the model layer, capabilities spread within months, and open-weight models are widely available. In physical supply chains, concentration is high: a few firms make leading-edge chips, HBM, EUV tools, and accelerators. That concentration is a supply-chain fact to underwrite rather than a reason to slow the technology.
Misinformation
The claim is that generative models will flood the information system with convincing fakes. The cost of producing synthetic text, images, voice, and video has fallen sharply, and fraud and impersonation using synthetic voice and video are rising. Detection and provenance tools are improving but imperfect, so fraud prevention is a growing part of Cyber.
The Capability Wall
The claim is that large language models ("LLMs") only predict the next token, have no model of the world, and are nearing a ceiling. Models trained this way, plus reinforcement learning, solve competition-level math and coding problems, and they are trained on images, video, audio, and sensor data, not only text. Some prominent researchers argue that new architectures are needed to reach human-level intelligence, and models still struggle with novel puzzles that people find easy and with long tasks, and they make up facts. If new architectures are needed, that changes which companies win, not whether compute demand grows.
Bull Narratives
Three bull claims also go further than the facts. "Value accrues to the labs": prices for a given capability fall fast, and rivals catch up within months. "Memory is cheap on peak earnings": memory has always been cyclical, and shortages end when new fabs arrive, which takes years. "Power is scarce, so anything with a plug wins": the binding constraints are permits, interconnection, and equipment, which favor owners of secured sites and suppliers with backlog.
The Risks
The real risks are policy, sentiment, credit, physical supply, and China. The table gives the author's ratings of likelihood over two years and impact on the thesis.
| Risk | Likelihood (2 years) | Impact on thesis | Exposed |
|---|---|---|---|
| Policy | Medium | High | Power, Infrastructure |
| Sentiment | Medium, rising if moratoriums spread | High where a campus is the asset | Data centers, grid projects, BTM |
| Credit: capex digestion | Medium | Medium | Semiconductors, memory |
| Credit: single-counterparty stress | Less likely | High | Host clouds, vendors |
| Credit: efficiency outruns demand | Unlikely | Very high | Neoclouds, single-tenant campuses, closed labs |
| Firm supply | High | Low | Tailwind for turbine, grid, BTM suppliers |
| Interconnection | High | Low (high for an unconnected campus) | Data centers, neoclouds |
| Supply chain | High | Low | Chips, Infrastructure |
| Memory-cycle turn | Likely | Low | Memory (relieves hyperscaler capex, device margins) |
| China: Taiwan | Very low | Very high | Every layer above silicon |
| China: rare earths | Medium | Low | Robotics, drones, motors |
| China: IP theft | High | Medium | US frontier lead |
| China: export controls | Swings likely | Chip and equipment revenue, not the buildout | Chips, equipment |
| China: military | Tracks frontier gap | Total | Everything |
| Europe | Very high | Very low | Hyperscalers, software, closed labs |
Policy
A regulated slowdown is more likely to stall the buildout than a financial bubble. Federal policy seeks to preempt state SI (AI) laws, but until Congress or the courts act, a patchwork of state laws remains. Permitting for generation, transmission, fabs, and data centers can take longer than building them, and tariffs and export controls can change quickly. Power and Infrastructure are most exposed.
Sentiment
Public opposition decides zoning hearings and elections whether or not the narratives behind it are correct. Local opposition can delay or block projects through zoning, permits, moratoriums, and ballot measures, and local and state restrictions on new data centers are spreading, including statewide pauses on permits. Markets reprice on sentiment before any statute changes. Data centers, grid projects, and BTM installations are exposed.
Credit
Much of the buildout depends on credit markets and a few large customers. Debt, private credit, and off-balance-sheet structures finance a growing share of campuses and GPU fleets, and depreciation assumptions for servers are debated. Three outcomes matter: a capex digestion phase that flattens spending, stress at a single large customer that cannot fund its commitments, and efficiency outrunning demand so that older-accelerator rents fall below cost. Neoclouds, single-tenant campuses, and closed model labs are most exposed.
Firm Supply
New firm generation is not keeping pace with load growth. Large gas turbines are back-ordered for years, and new nuclear takes many years to license and build. The likely result is slippage rather than lost demand: campuses energized in phases, sited where power exists, or built behind the meter, which favors turbine, grid equipment, and BTM suppliers.
Interconnection
Connecting new supply or load to the grid takes years, and the wait has lengthened. Queue position is a strategic asset; data centers and neoclouds without a secured connection are exposed.
Supply Chain
Some inputs cannot be scaled quickly with money. Skilled trades take years to train, and leading-edge chips, HBM, and EUV tools each have one to three suppliers. The symptom is schedule delay rather than lost demand.
China
China presents several distinct risks.
Taiwan
Most of the world's leading-edge chips are made in Taiwan, and China's military conducts exercises around Taiwan that rehearse a blockade. United States fabs produce leading-edge chips but receive the most advanced processes after Taiwan. A blockade is the least likely and most severe risk to the stack: every layer above silicon would stall.
Rare Earths
China dominates rare earth refining and magnet production and has restricted exports. Disruption would hit magnets and motors for robots, vehicles, drones, and defense systems.
Intellectual Property Theft
United States labs have reported China-based groups distilling their models, which shortens the American lead without removing it.
Export Controls and Smuggling
The debate has two sides. For controls: compute is a key input to frontier models, so restricting chips can slow rivals. Against: restrictions can be evaded through third countries and push China to build its own chip supply. Policy swings are likely either way, and the impact falls on chip and equipment revenue more than on the buildout.
Military
China's military doctrine names "intelligentized warfare" as the coming form of war, and Chinese models trail the United States frontier by months. If China reached systems far beyond human capability first, the consequence would be strategic rather than commercial.
Europe
The European Union's AI Act imposes compliance obligations on high-risk uses, and the European Union has moved to delay some deadlines. Europe raises costs for American platforms without much slowing the buildout; hyperscalers, software companies, and closed model labs carry the exposure.
The Signals
The signals measure how turbulent the path is and which readings justify sizing up or down. Combined frontier-lab revenue is the lead signal, and rental prices for older GPUs are the confirming signal. The view changes if lab revenue stalls for two consecutive quarters, if older-GPU rents fall below cost and stay there, if capability pacing becomes binding law, or if China closes the frontier gap to under three months.
| Signal | Confirms | Breaks |
|---|---|---|
| Frontier-lab revenue, all labs (lead) | Compounds and converts to operating cash | Flat two consecutive quarters across leading labs |
| Older-GPU rental prices (confirming) | Hold as new generations ship | Below hardware cost and stays there |
| Contracted cloud backlog | Grows faster than capex | Sequential declines at two or more of the largest clouds |
| Hyperscaler capex guidance | Rises with backlog | Two or more of the largest buyers guide flat or down |
| Hyperscaler and neocloud credit spreads | Narrow relative to banks | Widen sharply, or a data center bond is pulled |
| Foundry capex and advanced packaging | Capacity added against orders | Capex cut at the leading foundry |
| Memory contract pricing | Long-term contracts settle higher | Contract prices fall for consecutive quarters |
| Turbine and transformer order books | Backlogs grow | Cancellations rise |
| Capacity auctions and interconnection | New supply responds to price | Shortfalls widen with little new supply |
| Policy | Tariffs and permitting reform spread, not moratoriums | A binding capability cap, or a second large state pauses permits |
| China frontier gap | Widens | Closes to under three months |
| Adoption and productivity | Productivity growth above trend, sustained | Adoption flat for a year |
Demand and Cash
Frontier-lab run-rate revenue, disclosed or inferred, is the lead signal because it sits closer to end demand than any hyperscaler proxy. Hyperscaler capex guidance and backlog, utilization rates, and token volumes inform the picture but rank beneath it. Reported revenue also has to convert to cash. A divergence sustained across several quarters and several operators is the warning; a single miss is not.
Capital and Credit
The buildout depends on open credit markets, so spreads matter more than headlines about debt. The readings are spreads on hyperscaler, neocloud, and data center debt; private credit appetite; changes to depreciation lives; GPU rental and resale prices; and the path of rates.
Supply Discipline
Capacity added against firm orders extends the cycle; capacity added on speculation tends to end it. The readings are leading-foundry capex and advanced-packaging capacity, HBM additions and contract prices, and turbine and transformer order books.
Power and Grid
Permits and queue position determine where power arrives, so they are better signals than generation forecasts. The readings are interconnection timelines, air-permit and pipeline approvals for BTM plants, large-load tariff decisions, capacity auction results, and the mix of BTM gas against grid-tied firm generation.
Policy and Sentiment
Permits and moratoriums change before prices do. The policy readings are federal preemption, permitting reform, export-license policy, and equipment tariffs; the sentiment readings are local moratoriums, ballot measures, polling, and how candidates talk about data centers.
China
The frontier gap between Chinese and American models, measured by independent evaluations, is the China signal that matters most. Taiwan Strait activity, rare earth licensing, and smuggling enforcement are tracked alongside it.
Adoption and Productivity
The adopter half of the thesis is tested by enterprise results. The readings are agent deployments inside systems of record, results management is willing to quantify, productivity data, and white-collar hiring, especially at entry level.
| # | Company | Size |
|---|---|---|
| 1. | AAPL Consumer edge AI ready devices in hands of most affluent consumers (AMEX of hardware) Applications: Devices, Streaming | 9.75% |
| 2. | GOOGL Full stack AI: ASIC, frontier model, cloud, edge devices, SaaS; Waymo fleet, YouTube Applications: Streaming, Devices, RoboticsChips: Custom ASICInfrastructure: Hyperscaler, QuantumModels: Closed | 9.14% |
| 3. | NVDA Leading integrated AI hardware & software (Apple of data centers); open models Chips: SemiModels: Open | 6.28% |
| 4. | AMZN Largest cloud for AI training/inference; robotics + logistics flywheel Applications: Ecommerce, Robotics, StreamingChips: Custom ASICInfrastructure: Hyperscaler | 6.21% |
| 5. | TSLA AV / taxi fleet & humanoid robots, solar power & battery, full stack AI & US foundry Applications: RoboticsChips: FoundryEnergy: SolarModels: Closed | 3.10% |
| 6. | SPCX Reusable rockets, orbital compute & communications, neocloud & frontier model Applications: SpaceInfrastructure: NeoCloudsModels: Closed | 2.60% |
| 7. | MSFT Global majority standard for corporate & government SaaS and cloud Applications: SoftwareInfrastructure: Hyperscaler, Quantum | 2.50% |
| 8. | ASML Sole EUV lithography; no advanced node without it (export-controlled) Chips: SME | 1.89% |
| 9. | MU Only US HBM at scale; memory wall for training & inference; NVIDIA supply partner Chips: Memory | 1.89% |
| 10. | AVGO Custom AI ASICs for hyperscalers + merchant networking silicon Chips: Custom ASICInfrastructure: Networking, Optical | 1.80% |
| 11. | PLTR Ontology + AI for gov/enterprise decisions (not just copilots) Applications: Software | 1.79% |
| 12. | TSM Only foundry at leading-edge volume for AI ASICs & GPUs Chips: Foundry | 1.58% |
| 13. | CEG Largest US nuclear fleet — firm MWh for AI load growth Energy: Nuclear | 1.48% |
| 14. | META Open models (Llama) + hyperscaler capex + devices in a billion hands Applications: DevicesInfrastructure: HyperscalerModels: Open | 1.45% |
| 15. | CAT Machines for reshoring, mining, and grid/data-center civil works Energy: BTMInfrastructure: Data Center | 1.31% |
| 16. | SNDK NAND for model weights, KV-cache & checkpoints — cheap bulk memory beside HBM in AI racks Chips: Memory | 1.24% |
| 17. | 1.11% | |
| 18. | 1.05% | |
| 19. | VRT Power + cooling for AI racks — the thermal/electrical bottleneck Energy: 800V DCInfrastructure: Data Center | 0.96% |
| 20. | 0.95% | |
| 21. | BE Pricey but fastest BTM electrons; SOFC is electrochemistry not combustion — cleaner than burning gas on-site Energy: BTM | 0.93% |
| 22. | FCX US copper — electrification & AI power wiring metal Materials: Critical Materials | 0.92% |
| 23. | 0.92% | |
| 24. | GEV Largest US maker of gas turbines for BTM + grid transformers; multiyear backlog — capacity adds are the scarce option if AI load clears the queue Energy: 800V DC, Grid | 0.86% |
| 25. | LITE Datacom lasers & optics for AI cluster interconnect Infrastructure: Optical | 0.86% |
| 26. | MP Only scaled US rare-earth mine & magnet chain — motors/robots/defense Materials: Critical Materials | 0.71% |
| 27. | 0.67% | |
| 28. | PWR Builds US transmission & DC campuses — the construction side of AI power Energy: GridInfrastructure: Data Center | 0.60% |
| 29. | 0.59% | |
| 30. | 0.52% | |
| 31. | 0.49% | |
| 32. | CRWD Cloud-native endpoint & identity defense as AI expands attack surface Applications: Cyber | 0.47% |
| 33. | 0.44% | |
| 34. | CRDO Active copper/optics cables — GPU-to-GPU reach inside AI fabrics Infrastructure: Networking, Optical | 0.43% |
| 35. | IBM Enterprise AI software + quantum; mainframe trust for regulated workloads Applications: SoftwareInfrastructure: Quantum | 0.43% |
| 36. | IONQ Trapped-ion quantum — long-horizon compute beyond classical GPUs Infrastructure: Quantum | 0.43% |
| 37. | 0.43% | |
| 38. | MRVL Custom AI silicon + optical DSPs for cloud networking Chips: Custom ASICInfrastructure: Networking, Optical | 0.42% |
| 39. | AMAT Process tools that print every advanced node; choke point for capacity adds Chips: SME | 0.40% |
| 40. | BSX Cardio & interventional devices — cash compounder outside AI Applications: Health | 0.40% |
| 41. | CRM Enterprise system of record adding agents on top of customer data Applications: Software | 0.40% |
| 42. | 0.40% | |
| 43. | PANW Platform cybersecurity as AI expands identity & data sprawl Applications: Cyber | 0.40% |
| 44. | ALAB Scale-up fabric silicon linking GPU/ASIC packages inside the rack Infrastructure: Networking, Optical | 0.39% |
| 45. | 0.39% | |
| 46. | EQT Largest US natgas producer (Appalachia) with midstream reach — feedstock scale for BTM/peaker AI power Energy: BTM | 0.39% |
| 47. | 0.39% | |
| 48. | 0.37% | |
| 49. | QCOM On-device / edge AI silicon in phones, PCs, autos, robots Applications: RoboticsChips: Edge | 0.36% |
| 50. | ANET Ethernet switching that wires AI training clusters at scale Infrastructure: Networking | 0.34% |
| 51. | 0.32% | |
| 52. | 0.32% | |
| 53. | CRS US specialty steel/alloys for aerospace & defense Materials: Critical Materials | 0.30% |
| 54. | 0.23% | |
| 55. | BAC US money-center balance sheet — deposits funding the real economy Applications: Tokenization | 0.22% |
| 56. | COF US consumer credit — card + bank deposit franchise Applications: Tokenization | 0.22% |
| 57. | 0.22% | |
| 58. | 0.22% | |
| 59. | APH Connectors & high-speed cabling — every GPU rack is a copper/optics problem Applications: RoboticsEnergy: 800V DCInfrastructure: Networking, Optical | 0.20% |
| 60. | TSEM Specialty analog/RF foundry — sensors, power, mixed-signal for robotics Chips: Foundry | 0.18% |
| 61. | 0.17% | |
| 62. | INTC US foundry rebuild + x86 CPUs; sovereign advanced packaging bet Chips: CPU, Foundry | 0.16% |
| 63. | STX Nearline HDD capacity for AI training data lakes (cheap $/TB vs flash) Chips: Memory | 0.14% |
| 64. | WDC Mass capacity HDD (+ flash stack) for AI data lakes & archives Chips: Memory | 0.14% |
| 65. | BWXT Only US naval reactor + SMR builder; nuclear supply for firm AI power Energy: Nuclear | 0.11% |
| 66. | AEXA US blank-check vehicle — ignore until operating thesis exists Applications: Tokenization | 0.09% |
| 67. | 0.05% | |
AAOI US optical transceivers; AI cluster east-west bandwidth without China supply Infrastructure: Optical | (Watch) | |
ADI Precision analog & converters — robots, autos, and industrial sensing can't run on digital alone Applications: RoboticsChips: Analog | (Watch) | |
ALGM Magnetic sensing & power for robots, autos, industrial motion Applications: RoboticsChips: Semi | (Watch) | |
AMBA Edge CV SoCs — cameras that run models on-device Applications: RoboticsChips: Semi | (Watch) | |
AMD #2 training GPUs + EPYC CPUs; only real alternative stack to NVIDIA Applications: RoboticsChips: CPU, GPU | (Watch) | |
(Watch) | ||
ASST Bitcoin treasury asset manager — crypto balance-sheet vehicle Applications: Tokenization | (Watch) | |
AVAV US combat & recon drones; autonomy stack for contested air Applications: Drones | (Watch) | |
(Watch) | ||
BMNR ETH treasury / mining — crypto operating company Applications: Tokenization | (Watch) | |
BNY Custody giant pushing tokenized assets onto rails it already owns Applications: Tokenization | (Watch) | |
CBRS Wafer-scale inference engines — latency/$/token alternative to GPU clusters Chips: Inference | (Watch) | |
(Watch) | ||
CDNS EDA duopoly with SNPS — stronger in custom digital/SoC & system analysis; AI densifies tape-outs and custom ASICs, more designs per watt/node Chips: EDA & IP, SME, Semi | (Watch) | |
COIN Largest US crypto exchange — on-ramp for digital assets Applications: Tokenization | (Watch) | |
DELL AI server OEM shipping NVIDIA/AMD rack systems at scale Infrastructure: Data Center | (Watch) | |
EMR Factory automation controls — robots need the PLC layer Applications: Robotics | (Watch) | |
(Watch) | ||
(Watch) | ||
(Watch) | ||
GLW Optical fiber & specialty glass for AI campus & long-haul links Infrastructure: Optical | (Watch) | |
GS Global IB + markets — financing & trading the buildout Applications: Tokenization | (Watch) | |
(Watch) | ||
JBL Contract manufacturer assembling AI servers & networking hardware Infrastructure: Data Center | (Watch) | |
KTOS Low-cost attritable drones & defense autonomy Applications: Drones | (Watch) | |
MPWR High-efficiency power ICs feeding CPUs/GPUs/ASICs in AI systems Applications: RoboticsChips: Power | (Watch) | |
(Watch) | ||
NET Edge network + zero-trust; AI apps need global PoPs & security Applications: Cyber | (Watch) | |
NXT US utility-scale solar trackers — cheapest incremental electrons for AI Energy: Solar | (Watch) | |
ON Auto/industrial power & sensing — robots and EVs share the BOM Applications: RoboticsChips: Power | (Watch) | |
OUST Lidar for autonomy; perception layer for robotaxis & industrial robots Applications: Robotics | (Watch) | |
(Watch) | ||
POWL Switchgear for data centers & grid — long-lead electrical bottleneck Energy: Grid | (Watch) | |
RBC Precision bearings — motion in aero & industrial robots Applications: Robotics | (Watch) | |
ROK Factory automation stack — the plant OS for reshoring Applications: Robotics | (Watch) | |
RRX Motors & motion for automation and DC mechanical Applications: RoboticsInfrastructure: Data Center | (Watch) | |
SHOP Merchant OS; AI agents for commerce at the edge of the economy Applications: Software | (Watch) | |
(Watch) | ||
SNPS EDA duopoly with CDNS — broader stack + DesignWare IP royalties; AI expands verification load and reusable IP attach across foundry nodes Chips: EDA & IP, SME, Semi | (Watch) | |
(Watch) | ||
TXN Analog & embedded workhorses in every robot, auto, and industrial board Applications: RoboticsChips: Analog | (Watch) | |
(Watch) | ||
VPG Precision sensors & resistors — measurement layer for robotics/industrial Applications: Robotics | (Watch) | |
(Watch) |